7kW DAB Controller Implementation

Project Overview

A 7 kW Dual-Active Bridge (DAB) prototype was developed to validate advanced control implementations on real power hardware. As part of the Universitas Gadjah Mada – PT PLN (Persero) Collaboration, this work focused on bridging simulation results with real-time experimental testing.


Core Contributions & Technical Execution

1. Controller Code Generation & Deployment

  • The Challenge: High-power hardware requires a reliable transition from idealized simulation to real-time executable code to ensure safety and performance.
  • My Execution: I utilized PLECS Coder to generate hardware-compatible C code from the control models for the TI Launchpad F28379D.
PLECS Implementation

Figure 1. Controller logic implementation in the PLECS environment.

2. Startup to Closed-Loop Performance Validation

  • The Challenge: Validating the developed control algorithm on a physical 7kW DAB prototype to ensure stability and safety under high-power conditions.
  • My Execution: I used PLECS Coder to generate real-time C code from the developed control logic for the TI Launchpad F28379D. My teammate, Taufik Dwi Cahyo, and I then validated the system experimentally on the 7 kW DAB prototype, confirming stable startup and reliable closed-loop regulation.
DAB Prototype Setup

Figure 2. Full DAB prototype setup, complete with current and voltage probes, an oscilloscope, and the controller.

Oscilloscope Plot

Figure 3. Oscilloscope capture of experimental results.