7kW DAB Controller Implementation
Project Overview
A 7 kW Dual-Active Bridge (DAB) prototype was developed to validate advanced control implementations on real power hardware. As part of the Universitas Gadjah Mada – PT PLN (Persero) Collaboration, this work focused on bridging simulation results with real-time experimental testing.
Core Contributions & Technical Execution
1. Controller Code Generation & Deployment
- The Challenge: High-power hardware requires a reliable transition from idealized simulation to real-time executable code to ensure safety and performance.
- My Execution: I utilized PLECS Coder to generate hardware-compatible C code from the control models for the TI Launchpad F28379D.

Figure 1. Controller logic implementation in the PLECS environment.
2. Startup to Closed-Loop Performance Validation
- The Challenge: Validating the developed control algorithm on a physical 7kW DAB prototype to ensure stability and safety under high-power conditions.
- My Execution: I used PLECS Coder to generate real-time C code from the developed control logic for the TI Launchpad F28379D. My teammate, Taufik Dwi Cahyo, and I then validated the system experimentally on the 7 kW DAB prototype, confirming stable startup and reliable closed-loop regulation.

Figure 2. Full DAB prototype setup, complete with current and voltage probes, an oscilloscope, and the controller.

Figure 3. Oscilloscope capture of experimental results.